When Time is Money….
The Design/Build process brings the architect and selected contractor together at the inception of the project. Involving the contractor during the design process allows collaboration of construction materials and methods. Full and open communication is essential between building owner and design/build team members.
Utilizing the Design/Build method, projects can generally be completed in less time, allowing occupancy and utilization of the project.

Design Driven
The first stand-alone dealership not associated with a BMW dealership required teamwork and attention to detail. From the cantilevered jewel box car displays on the second floor to the geothermal heating and cooling system shoe-horned into an urban infill site that was formerly an Arby's, the sleek black building demands your attention. Even in the service bays, where you'll find precision engineered german tile flooring and in-ground lifts that are powered by environmentally friendly vegetable oil, no detail was overlooked.